Start-up of photovoltaic farm by the plant in Jedlicze

15-09-2019

We have also started up the photovoltaic plant in Jedlicze. It consists of the two group of panels placed directly on the roof of the production hall and warehouse with the total power of 100,1 kWp. The produced energy is passed to the low-voltage distribution in plant and then it is consumed by the production machinery.

For the aforementioned installation the overcapacity in electricity generation is not expected - all the energy generated will be consumed by the plant’s current energy needs.

news list

If you want to be up to date, sign up to receive our newsletter.